Call us now
Home Bathroom Remodeling in Edina

Bathroom Remodeling in Edina

Custom bathroom remodels for Edina homes since 1983. Mid-century ramblers, split-levels, and Morningside colonials — one Twin Cities team delivering bathroom work that matches what Edina homeowners expect.

The garden tub in your Edina primary bath has not been used in eight years. Here is what should be there instead.

Edina primary bathrooms from the 1980s and 1990s share a common floor plan — a large garden tub that nobody fills, a separate shower that is too small, a double vanity with a soffit above it that cuts the ceiling height, and tile that made sense during the Reagan administration. The room is big enough. The plumbing is there. What is missing is a layout that reflects how people actually use a bathroom in 2025. Converting that space into something that works is one of the most consistent projects we do in Edina.

  • Primary bath conversions — garden tub removal, expanded walk-in shower, reconfigured vanity and storage

  • Mid-century rambler bathrooms — full gut and rebuild, new layout, updated plumbing throughout

  • Hall and secondary bathroom updates — tile replacement, fixture upgrade, improved storage

  • Heated floor installation, frameless shower enclosures, freestanding tub additions where scope allows

  • Supply and drain line updates where original plumbing affects the new fixture layout

  • All Edina city permits managed — plumbing, electrical, and mechanical from application to final inspection

Our services
Bathroom Remodeling in Edina

Need a quote? Send details.

Edina bathrooms split cleanly into two eras. The mid-century ramblers from the 1950s and 1960s have small, functional bathrooms that were built to do one job and have never been updated. The 1980s and 1990s homes have large primary bathrooms that were built around trends that aged poorly. Both need remodeling — they just need different things.

The 1980s and 1990s primary bathroom problem

The garden tub is the most reliable indicator of a bathroom that needs rethinking. It was a status symbol in 1991 and it is an obstacle in 2025 — it takes up a quarter of the room, it has not been filled in years, and it sits directly across from a shower that is too narrow to be comfortable. Removing the garden tub and using that square footage to build a proper walk-in shower is the single move that transforms these bathrooms. What was a large room with two underperforming fixtures becomes a large room with one fixture that actually gets used.

The vanity wall usually gets addressed at the same time. The original soffit above the double vanity compresses the ceiling height and creates a storage box that is more trouble than it is worth. Removing the soffit, raising the mirror height, and reconfiguring the storage below the countertop changes how the whole room feels. Add heated floor tile and a frameless shower enclosure and the primary bath in a 1993 Edina colonial starts performing at the level of the house around it.

Mid-century rambler bathrooms

The bathrooms in 1950s and 1960s Edina ramblers are a different project. Small rooms, original fixtures, tile from an era that predates grout that stays clean, and plumbing that has been patched more than replaced. The goal here is not renovation — it is rebuilding. New subfloor, new waterproofing, new tile, new fixtures in positions that make sense for the space. The room is small, which means every square inch of the layout has to earn its place. We have planned enough of these to know how to fit a walk-in shower, a proper vanity, and real storage into a room that initially looks like it cannot hold all three.

What the plumbing work involves in Edina

Mid-century Edina homes have original supply and drain lines that are at the end of their useful life. We replace them during the remodel — copper or PEX supply, PVC drains — and rough in new fixture locations as part of the scope. In the 1980s and 1990s homes, the plumbing is newer but often needs to be rerouted to support the reconfigured layout. Either way, the plumbing work gets permitted with the City of Edina and inspected at rough-in and final.

Bathroom remodel cost in Edina

A mid-century rambler bathroom full rebuild runs $30,000 to $65,000 depending on size and finish level. A primary bath conversion in a 1980s or 1990s home — garden tub removal, expanded shower, new vanity, heated floor — runs $55,000 to $110,000. A premium primary bath with freestanding tub, custom tile work, and high-end fixtures runs $110,000 to $175,000+. Written budget range provided at the first consultation before planning begins.

Schedule and timing

Planning takes three to six weeks for a bathroom remodel in Edina. On-site construction runs four to eight weeks depending on scope. Edina building and plumbing permits typically review in one to two weeks. Total time from first consultation to a finished bathroom is typically three to five months.

Find out what your Edina bathroom can become

We come to your home, assess the existing bathroom and plumbing conditions, and give you a written budget range at no charge. The first meeting is useful whether you are ready to start or still deciding — you leave with a clear picture of what the project involves.

Leave a reply

Common Questions

Edina bathroom remodeling FAQ

Questions we hear most often from Edina homeowners planning a bathroom remodel — whether it is a mid-century hall bath or a primary suite that has not been touched since 1994.

100%

client satisfaction

On-time communication
97%
Project approval rate
96%
Repeat referrals
91%
  • Almost always yes. Garden tubs in Edina primary baths from the 1980s and 1990s take up significant floor space and rarely get used. Converting that square footage to an expanded walk-in shower produces a bathroom that functions significantly better. The cost is usually offset by how much more the room gets used.
  • Yes — electric radiant heat under tile is one of the most popular additions in Edina primary bath remodels. It gets installed during the tile setting phase and wired to a programmable thermostat. The cost is modest relative to the overall project and the comfort difference is significant in a Minnesota winter.
  • We remove it as part of the remodel in most cases. The soffit was built to hide ductwork or plumbing that can usually be rerouted, or sometimes it is just a framed box with nothing in it. Removing it raises the visual ceiling height of the vanity wall and gives the room a much cleaner look.
  • A primary bath conversion in a 1980s or 1990s Edina home — garden tub removal, expanded shower, new vanity and tile — runs $55,000 to $110,000. A premium scope with freestanding tub and custom tile work runs $110,000 to $175,000+. We give a specific written range at the first consultation.
  • Yes — we handle all permit applications and inspections with the City of Edina. Plumbing, electrical, and building permits as required by the scope are all coordinated by our team from submission through final sign-off.

Service Areas

We Work Near You

Forty-three years in one market means we know the housing stock house by house — the bungalow framing in south Minneapolis, the brick colonials of Highland Park, the mid-century ramblers of Edina, the custom 1990s two-stories of Eden Prairie. We construct high end, quality, sutainable homes in the city you live in.

Our Services

We help make dream homes

Our experienced team is ready to satisfy your remodelling needs. We are professional in HVAC, Roofing, Siding and Window services. Contact us to get home improvement services now!

Knutson Custom Custom remodelers is a locally owned remodeling company dedicated to bringing your vision to life through quality craftsmanship. We collaborate with trusted local craftsman, skilled tradespeople, and members of the architectural and design community to create beautiful spaces tailored to your needs.

Why Choose Us

Built Right From Start

  • Licensed Insured Reliable Efficient Trusted Durable Detailed Licensed Insured Reliable Efficient Trusted Durable Detailed
    Efficient Trusted Durable Detailed Licensed Insured Reliable Efficient Trusted Durable Detailed Licensed Insured Reliable

    100%

    Client Satisfaction

  • Every project is shaped around your space, goals, and the way you actually live.

    Tailored Approach

  • Client Satisfaction

    100%

    Our Goal is simple: %100 client satisfaction on every project, every time

  • Full estimates with itemized scope, allowances, and selection budgets up front.

    Transparent Pricing

We help make dream homes

Knutson Custom Remodels

We’re Here To Help!